It first builds the model by using curve fitting toolbox to fit the unit input output curves, and then dispatch the load with the aid of optimization toolbox.
首先利用曲线拟合工具箱拟合机组的煤耗特性曲线进行建模,再使用优化工具箱进行负荷优化分配。
The model USES the optimization technology to maximize the total profit and it has the advantage of obtaining the output directly from the input.
该模型由于使用了投入占用产出模型和总利润最大的优化过程,而具备可以直接从投入求得产出的结果等优点。
Using the Input - Output model and linear programming method, this article sets up a model of the industrial structure optimization.
根据投入产出模型,利用线性规划方法,建立了中国的产业结构优化模型。
应用推荐