An example of modeling purchasing strategy optimization in generation capacity market was applied for simulation test. Numerical results and analysis validate the proposed indices and models.
以发电容量市场购电决策最优化为例建模并进行数值仿真,实验结果表明了文中所述模型的合理性和有效性。
It also helps in generation of data migration maps, to perform dependency analysis and also helps in optimization of target system data model.
还有助于生成数据迁移映射,以执行依赖性分析,而且还有助于优化目标系统数据模型。
The critical problems of capacity and coverage will be discussed in the process of third generation mobile network planning and optimization.
给出了第三代移动通信网络规划与优化过程中基站容量与其覆盖两者之间的关系。
应用推荐