The time value of capital in schedule cost optimization and the influence of the income of running period to schedule cost optimization of engineering project is mainly studied in this paper.
本文重点研究了工程项目建设期进度费用优化中资金的时间价值以及工程项目运营收益对项目建设期进度费用优化的影响。
And it is considered a effective approach to apply dynamic optimization management and decision with network schedule technique in complex large system project schedule.
指出在复杂大系统工程项目计划中,利用网络计划技术进行动态优化管理与决策是工程项目计划管理与决策的一种有效途径。
The research area in production schedule based on artificial neural network includes: data description, optimization computation and knowledge handling.
在本文中,生产作业计划人工神经网络模型的研究可分为三个方面:数据处理、优化计算和知识处理。