As for the problems of optimal design on mechanical products, it is quite difficult to make a correct decision in the stage of scheme design due to too many involved factors.
对于机械产品优化设计问题,由于涉及因素较多,在方案设计阶段很难作出正确决策。
So it is necessary to study the optimization operation of hot oil pipeline after adding DRA, which can make optimal scheme and provide basis for scientific decision.
因此,有必要对热油管道中添加减阻剂的优化运行进行研究,制定最优运行方案,为科学决策提供依据。
With fully consideration on the unit's secure and economical indices, the decision-making scheme achieves the optimal operation of pumping station as a whole.
这种决策方案充分考虑了机组的安全性、经济性指标,从总体上达到了泵站运行的最优化。
应用推荐