The theory, model and method can be applied to both joint operation scheme optimization of hydropower stations and decision-making of other systems.
提出的可变模糊优选理论、模型与方法,不仅能用于水电站联合电力调度系统的方案优选,也可应用于其他系统的优选决策。
So it is necessary to study the optimization operation of hot oil pipeline after adding DRA, which can make optimal scheme and provide basis for scientific decision.
因此,有必要对热油管道中添加减阻剂的优化运行进行研究,制定最优运行方案,为科学决策提供依据。
The optimization operation is calculated taking Lishui river basin parallel connection system as the example compares it and the conventional operation scheme results.
以澧水流域并联系统为例进行了优化调度计算,并以常规调度方案成果进行了分析比较论证。
应用推荐