Through transmission line on-site operating and testing of power department, the respective technical performance index of the system has met objective requirements.
本系统经过电力部门输电线路监控现场运行与测试,各项技术性能指标已达到设计目标要求。
In the anti-traffic load on the system capacity, reliability and remote control of operating performance and other tests, the index has reached the design requirements.
在对系统的抗通信负载能力、远程控制的可靠性及运行性能等测试中,各项指数都达到设计要求。
According to the characteristics of PPP project, this paper discerns risks in the course of operating of PPP project, setting up Evaluation index system on risk of PPP project.
根据PPP项目的特点,识别PPP项目运作过程中的风险,建立了PPP项目的风险评价指标体系。
应用推荐