Open-pit mining follows the same sequence of oprations as underground mining: drilling, blasting, and loading and removing waste and ore.
露天采矿遵循与地下采矿相同的作业顺序:钻孔、爆破、装载并运走废料和矿石。
Open-pit mining follows the same sequence of operations as underground mining: drilling, blasting, and loading and removing waste and ore.
露天采矿遵循与地下采矿相同的作业顺序:钻孔、爆破、装载并运走废料和矿石。
This paper analyses problems concerning the conventional continuous loading structure in open mining deep borehole blasting.
本文分析了露天矿深孔爆破长期沿用的连续装药结构存在的问题。
应用推荐