The formation plugging effect caused by in situ wax crystallization and oil solidification were considered.
模型中考虑了地层中的析蜡过程和原油凝固及由此导致的地层堵塞。
The temporary plugging and acidizing technology can be used to solve the problems caused by formation heterogeneity during acidizing of oil wells, and improve the effect of acidizing.
暂堵酸化工艺可解决油井酸化时地层非均质性所暴露出的问题,提高酸化效果。
This paper also discussed the action mechanism of direct electric field strengthening oil discharge, increasing capacity of water injection and removing formation plugging.
探讨了直流电场强化油流、增加注水能力、解除地层堵塞等作用机理。
应用推荐