This paper studies the sensitivity of non-critical process in program evaluation and review technique (PERT) network.
本文研究了计划评审技术(PERT)网络中非关键工序的敏感性问题。
Now, when a non-critical application uses up, say, all of the threads within a process, your mission critical solutions will not be affected at all.
现在,当一个非任务关键型应用程序耗尽(比如)一个进程中的所有线程,那么您的任务关键型解决方案将不会受到丝毫影响。
In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.
该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。
应用推荐