非关键路径上的(Non-Critical Path) D.关键路径上的(Critical Path) 11、某项目的CPI 如下,它告诉我们成本方面的信息正确的是( )。
基于28个网页-相关网页
In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.
该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。
The reason for this is that an exception would divert the code from its normal execution path, and this is not desirable with these non-critical errors.
原因是将代码从它的正常执行路径转移,这些次要的错误都不可取的。
应用推荐