This paper presents a new gas well testinganalysis method considering gas well producing at constantpressurein infinite gas reservoir accounting for high velocitynon-Darcy flowef.
Because the energy flow is not just non-constant but also erratic, the back-up systems also need to be extremely sensitive and capable of ramping up from shut-down to fully-on within a very short period of time to prevent grid instability and even collapse.