The performance before and after retrofitting of the closed loop cooler of Huaneng Shantou Power Plant's No. 2 set are being compared by performance test data.
通过对华能汕头发电厂2号机组闭式循环冷却器改造前后的性能测试结果进行了对比。
Understand pump test theory and guide test fitter to follow the WI and procedure to build the test loop. Check and make sure no any potential issue before pump start .
理解泵测试的原理并现场指导测试操作工按照WI和程序搭建测试回路,检查和确认泵在启动前没有任何潜在危险因素;
应用推荐