Then some critical parts of the system should be reverse-engineered and the migration path to the new platform validated.
然后,应该将系统的一些关键部分逆向工程,并且验证到新平台的移植路径。
EBay is so convinced of the future of mobile phone shopping that on Wednesday it acquired Critical Path Software, a mobile phone app developer, to speed its move into this new arena.
在这里输入译文易趣对移动手机购物的未来充满了信心,易趣为了加快自己在这个领域的步伐周三购入了Critical Path软件公司,这是一件移动手机应用程序开发公司。
The multiplier in this paper is Bit-serial mode and the new hardware architecture is regular which reduces the delay of the critical path.
新的乘法器采用比特串行方式,使得硬件结构更加规则,减少了原有乘法器关键路径的延迟。
应用推荐