This paper discusses an optimization method to determine the minimum cost scheduling in network schedule by means of fuzzy linear programming.
本文提出用模糊线性规划求解网络计划最低费用日程的优化方法。
This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.
提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。
Project network technique is presently a frequently-used method to make project schedule plan.
目前,工程项目进度计划的编制多采用网络计划方法。
应用推荐