Based on the equivalent heat-drop method, the paper presents optimum design process of blowdown system in 200 MW generation unit.
利用等效焓降法对200 MW机组排污扩容器系统进行了优化设计。
This paper analyzes the problem exited in rubber ball cleaning unit, Shenmu Power Generation Corporation with 2 units (the capacity of each unit is 100 MW).
分析了神木发电公司2台100 MW机组胶球清洗装置存在的问题,提出并实施了一系列处理方案。
应用推荐