In addition, some technical problems in the construction and monitoring process are discussed.
同时对土钉支护在施工与监测过程的一些技术问题进行了探讨。
This paper introduces the main restoring treatment plan, technical request and construction process after the plumb-line of dam safety monitoring system was broken in Feilaixia Hydro Project.
文中介绍了飞来峡大坝安全监测系统倒垂线断裂后主要的修复处理方案、技术要求和施工过程,为水利工程中类似问题提供参考。
The whole process of breakwater riprapping construction was monitored by the prototype monitoring device buried in the sand soft nappe.
通过埋设在砂肋软体排上的原形观测仪器,对防浪围堤抛石施工过程进行了全程监测。
应用推荐