Based on the cable-stayed bridge using method of cantilever, the paper establishes the optimization model of construction phase with multi-objective and multi-constraint and gives the example.
采用多目标、多约束的优化方法,以悬臂施工主梁的斜拉桥为例,建立了施工阶段的优化模型,并给出算例。
Based on first-order optimization calculating theory, authors established the optimal finite element model of swivel construction of arch bridge adopting hydraulic sync elevation technology.
根据一阶最优化计算理论,构建了采用液压同步提升技术进行转体施工拱桥的优化有限元模型。
By building models of resources optimization in the practical bridge construction, the paper gives mathematics formula to evaluate optimization model using the same parameter.
建立了实际桥梁施工网络计划资源优化模型,提出用统一的参数来评价优化模型的数学公式。
应用推荐