The construction management model and measures for the third phase construction are introduced herein, and a good result is achieved.
从水电工程建设管理的角度,阐述了三峡三期工程建设的管理模式、管理措施及其取得的良好效果,可供同业人员参考。
The principle, operation of BOF off-gas analysis dynamic control model and measures to deal with excese carbon content at end-point are introduced.
介绍了目前国内外炼钢过程的自动化控制的意义及其现状,阐述了转炉炉气分析动态控制技术的基本组成和工作原理。
Graded responsibility, quick response, life first and psychological help are the basic model and measures for educational administrator to deal with urgent situations.
分级负责、快速反应、生命至上和心理帮助是教育管理者应对危机情境的基本模式和策略。
应用推荐