Model acceptance tests 模型验收试验
model acceptance test 模型验收试验
Technology acceptance model 技术接受模型 ; 科技接受模式
acceptance model 接受模型
Technology acceptance model TAM 技术接受模型 ; 科技接受模式
acceptance model tests of hydroturbine 模型验收试验
Information Technology Acceptance Model 信息接受理论模型
the user acceptance model 用户接受模型
Farmers Technology Acceptance Model 农户技术接受模型
This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station.
简要介绍了飞来峡水电站水轮机的模型验收试验的情况及结果。
As reference, some Suggestions are put forward for the model acceptance tests in the South-to-North Water Project to be similar with this pumping station.
同时,根据该试验验收过程提出了南水北调工程中泵站装置验收需要考虑的若干建议,供其它类似泵站试验验收参考。
Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.
岩滩水电站水轮机性能采用模型验收试验方式验收。其全模拟模型最高效率达到92%。
应用推荐