A digital simulation is made to the rock pressure distribution of faces with large mining height when crossing gob, which may guide engineering practice.
针对大采高工作面过空巷时的矿山压力分布进行了数值模拟,以掌握其分布规律,从而对工程实践提出指导性意见。
The lag distance of abutment pressure behind working face increases, but the convergence coefficient of vertical stress doesn't change obviously with the increase of mining height.
分层开采与综放开采工作面滞后支承压力变化规律是,随着采高的增大,工作面滞后支承力的距离加大,垂直应力集中系数差别不大。
Many mines or mining city in China are faced with many problems, such as severe environment pressure and exhausting resources etc.
我国许多矿山或矿业城市面临严重的环境破坏和资源枯竭问题。
应用推荐