...采煤方法规划 [gap=1320]sting property;water protection mining;shallow coal seam;ecological water level;mining method plan ...
基于4个网页-相关网页
Meanwhile, every mining technology was synthetically evaluated and the best plan was gained by applying fuzzy comprehensive evaluation method.
应用模糊综合评价法对各回采工艺方式进行综合评价,得到了最优方案。
The technology of crossing over fault, drifting and actual mining method and plan of crossing over fault at combined mining face under complex geology conditions in Jining no.
介绍了济宁二号矿复杂地质条件下综放工作面过断层技术,掘进和回采对断层的处理方法及回采工作面制定过断层方案的步骤。
An intelligent decision software for mining plan has been developed by combining mining CAD technique with intelligent method and achieved good results.
为此将人工智能科学与矿山CAD技术集成,开发出露天矿生产计划智能决策计算机系统,取得较好效果。
应用推荐