It is pointed out that the comparison and selection of development scheme are very important during the higher stage of engineering design for a mining project.
指出在矿山项目的高阶段设计中,开拓方案比选是非常重要的。
Oriented toward the development of a 3D visual modeling system for geological and mining engineering, a voxel- based algorithm for computing underground excavation volume is proposed.
根据地矿工程体视化仿真系统研究工作的需要,提出了一种基于体素的地下采掘工程量的计算方法。
应用推荐