... minimum-error decoding 最小误差译码 minimum-time problem 最小时间问题 minor control change 次要控制改变 ...
基于20个网页-相关网页
In this paper, the minimum cost flow problem with fuzzy constraint is proposed for the first time, and the corresponding mathematical model is constructed.
本文首次提出了带模糊约束的最小费用流问题,建立了相应的数学模型并给出了求解这一模型的有关算法。
A preemptive uniform machine scheduling problem with arrival time and minimum makespan is studied in this paper.
研究了可中断的带有到达时间的使总完工时间最小的恒速机排序问题。
To solve the problem of minimum time-to-climb, building a dynamic model of motion in the vertical direction and taking the flight mode as the linear load control.
以飞机在垂直平面的运动方程为基础,采用线性时间负荷控制的飞行模式,提出了求解飞机最短时间爬升轨迹的格点搜寻算法。
应用推荐