Huidong Lead Zinc Mine set up a production data acquisition and management system with cti technique in the light of its concrete conditions.
会东矿根据具体条件,建立了应用cti技术的生产数据采集与管理系统。
HIS is the valid method in the mine safe production and scientific administering of the mine hydrogeology data.
HIS是矿井安全生产和矿井水文地质资料的科学管理的有效途径和方法。
This paper introduces the technical process of Smelter of Saindak Copper and Gold Mine Project in Parkistan, organization for production and standard achieved and technical data.
介绍了巴基斯坦山达克铜金工程冶炼厂的工艺、达产达标生产的组织及技术指标。
应用推荐