The combined use of fuzzy mathematics, neural net method and gray system theory in the selection of mining method for Jinshan gold mine was a new trial.
将模糊数学、神经网络方法及灰色系统理论有机地结合起来,应用于金山金矿采矿方法选择中是一次新的尝试。
In view of site selection for ore transport system in mine, general plan optimization method of main production logistics system in mine was discussed in combination with engineering design examples.
针对矿山工程设计中物流系统的选址问题,结合工程实例探讨了矿山主要生产物流系统设计的优化方法。
During the experimental study on mining method in Huidong Lead-Zinc Mine, the selection of mining method is optimized through the approach of fuzzy mathematics.
在会东铅锌矿的采矿方法试验研究中,采用模糊数学方法进行采矿方法的优化选择。
应用推荐