A monolithic model of the lot-sizing and scheduling problem based on the JIT strategy has been proposed in this paper, and a heuristic algorithm using integrated method has been designed to solve it.
文章针对基于JIT思想建立的一种批量计划和作业排序集成问题,建立整体模型,设计了一种启发式算法采用集成方法求求解。
The master problem of the model corresponds to the basic scheduling strategy and the sub problem corresponds to on-line adjusting method.
策略由基本调度策略和在线调整两部分组成,分别与模型的主问题和子问题相对应。
应用推荐