In addition, according to measured temperature data of a RCC gravity dam, the thermal parameters inversion is done, whose result is used to calculate the temperature field again.
此外,本文结合某碾压混凝土重力坝工程,依据现场采集的坝体温度资料,对碾压混凝土热学参数进行反演,利用反演结果进行温度场反馈计算。
Through calculating, analysing and comparing the real data measured in two regions, indeed, it is proved that precision of gravity data after temperature correction increased somewhat.
由两个测区的实测重力资料计算分析和对比,证明改正格值受温度影响后,重力资料的精度有所提高。
Owing to use of dual synchronous CCD technology and data processing function of PC, effect of temperature to measured length of steel pipe is eliminated.
采用双同步CCD技术,结合上位机的数据处理功能,消除了在测量过程中温度对所测长度的影响。
应用推荐