RUP USES a master test plan for the overall project and an iteration test plan per iteration.
RUP对整个项目使用一个主测试计划,对每个迭代使用一个迭代测试计划。
These test levels can be coordinated by means of a master test plan (at the project level) and an iteration test plan (at the iteration level).
这些测试级别可以是并列的,这取决于主测试计划(在项目级)和迭代测试计划(在迭代级)。
It is a conversion project for an existing building that was initially constructed as a part of the Pudong landscape master plan.
该项目是初步建设浦东景观总体规划的一部分,为一栋原有建筑的转型项目。
应用推荐