According to different mark pattern recognition, a method based on the number of connectivity areas of the pattern and a method based on template match are presented.
对不同标志图案识别问题,提出了连通域数量判别法和模板匹配法。
Applying mark - number method to evaluate the lowest cost construction period within scheduling construction organization plan with martix merhod.
在矩阵法编制施工组织计划中,采用标号法求最低成本工期。
应用推荐