A mathematical model is proposed for daily reactive power scheduling for the demand of management of reactive power and voltage.
根据实际无功电压管理工作的需要,建立了日无功计划数学模型。
Rational planning of local reactive compensation and transformer capacity is very important for demand side management to reduce power losses and improve the economical power system operation.
合理的无功就地补偿和选择变压器容量可以降低损耗,提高系统运行的经济性,是电力需求侧管理的重要内容。
This paper introduces the basic situation of the reactive-load compensation equipment of Linfen power network, and advances some measures for the reactive voltage management.
介绍了临汾电网无功补偿设备的基本情况,提出了无功电压管理措施。
应用推荐