The maintechnicalproblemwasbearing inner diameter profile grinding, during processingnewproductYA2, so thatthediamondcontact rolleradjuster wasdesigned.
The province's main power station at Kilroot, near Belfast, was shut down following a technicalproblem with generators and the other power station at Ballylumford, near Larne, was only partially working.