This paper introduces the main restoring treatment plan, technical request and construction process after the plumb-line of dam safety monitoring system was broken in Feilaixia Hydro Project.
文中介绍了飞来峡大坝安全监测系统倒垂线断裂后主要的修复处理方案、技术要求和施工过程,为水利工程中类似问题提供参考。
The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.
三峡水利枢纽主要由拦河大坝及泄洪建筑物、水电站、通航建筑物组成。
Main products: turbine, furnace, petroleum machinery, mining equipment, stone dam seepage prevention project construction machinery, type coal etc.
主要产品有:汽轮机、拆炉机、石油机具、石材开采设备、大坝防渗漏工程施工机械、型煤机等。