In this paper, the working procedure Confirmation of Control Variable and Selection of Main Components and Part of Design Schematic of tread cutting system are expressed in detail.
详细介绍了胎面裁断系统的工作过程以及控制变量的确定、主要元件的选取和部分控制回路的设计图。
This paper analyzes the current situation of inspection and control for construction project, and puts forward the target, procedure and main job of safe inspection and control.
摘要文章分析了建设工程安全监理的现状,提出了安全监理的目标、程序和主要工作。
The paper introduces construction procedure and quality control methods of the bridge, also discusses observation results of main arch ring during construction and completion of work.
文中介绍了该桥的施工过程和关键工序的质量控制方法,以及在施工过程中和竣工后对主拱圈的观测测量结果。
应用推荐