The RCC initial-set time is the main basis of determining layer intermission time. The length of initial-set time affects the construction techniques and quality control measures.
碾压混凝土初凝时间是确定层面允许间歇时间的主要依据,初凝时间的长短会影响到施工工艺和质量控制措施。
The engineering techniques, mating equipment, machines and tools, main constructing point, problems encountering and their resolved methods were introduced based on construction case study.
结合工程实例介绍了其施工工艺、配套设备、机具、施工要点、施工中遇到的问题及解决办法。
The article makes detailed presentation of construction methods and techniques used in the cantilever concreting of the main Yinhe Bridge with form-traveler.
文章详细叙述了颍河特大桥主桥挂篮进行悬臂浇筑的施工方法和工艺等。