go top

long and medium term load

网络释义

  中长期电力负荷

中长期电力负荷

基于1个网页-相关网页

有道翻译

long and medium term load

中长期负荷

以上为机器翻译结果,长、整句建议使用 人工翻译

双语例句

  • Because the medium and long term load forecasting in distribution network is affected by many uncertain factors, up to now, no methods can obtain the satisfying forecasting results at all instances.

    由于配电网中长期负荷预测受到很多不确定因素的影响。因此,目前为止还没有哪一种方法保证任何情况下都能获得满意的预测结果

    youdao

  • Therefore, raising the precision of the medium arid long term power load forecast is of great significance to ensure security, economy and the excellent operation of power grids.

    因此提高中长期电力负荷预测精度对于保障电网安全经济优质运行具有重要意义。

    youdao

  • Aiming at the features of medium and long-term load forecasting, a comprehensive model for medium and long-term load forecasting based on Analytic Hierarchy Process (AHP) was put forward.

    针对中长期电力负荷预测特点提出一种基于AHP(层次分析法)的中长期电力负荷预测综合模型

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定