基于2013版计量规范的超高施工增加缺项处理研究-建筑经济 关键词:超高施工增加;缺项处理;清单计价;定额 [gap=494]Keywords:ultrahigh construction increase;short term treatment;list valuation;quota
基于52个网页-相关网页
engineering quantity list valuation 工程量清单计价
list valuation model 清单计价模式
quantities detailed list valuation 工程量清单计价
rating valuation list 差饷估价册
list valuation standard 清单计价规范
quantities list valuation 工程量清单计价
Enacting the construction contract condition of the construction engineering, which is suitable for the valuation system of the list of engineering amount.
制定与工程量清单计价体系相适应的建设工程施工合同条件。
In principle, content and method, the valuation method of engineering volume list (EVL) is quite different from the previous one which adopted quota valuation mode.
工程量清单计价法从原理、内容及方法上与原有定额计价模式相比有很大差别。
With the entry to the WTO, valuation of construction engineering in China is converging to-ward the international mainstream, adopting valuation based on engineering quantity list.
随着我国加入世界贸易组织,建设工程计价与国际接轨,全面实行工程量清单计价已是大势所趋。
应用推荐