The contractor shall retighten the nuts one week after joint installation and a second time just before final lining and leveling of the track.
承包商应于接头安装后一周重新拧紧螺母,并就在轨道最终衬砌和整平前再一次拧紧。
There are three components to this system: a large electrical power source, metal coils lining a guide way or track, and large guidance magnets attached to the underside of the train.
这种系统有三个组成部份:一个大电源、一条导向线路或轨道沿线的金属线圈、以及附加在列车下面的大导向电磁铁。
Insulated joints if required shall be installed just before final leveling and lining of the track.
需要时,绝缘接头应在轨道最终衬砌和整平前安装。
应用推荐