Yangcheng power plant Transmission Project is a typical system having large capacity power plant connected to main system through long line.
阳城电厂送出工程是典型的大容量电厂经长线路送电的系统。
Double circuit transmission line is widely adopted in China owing to the demand of large-capacity power transmission.
由于大容量输电的需要,双回线路在国内广泛采用。
The transmission line fault has effect on transmission capacity limitation and capacity credit of wind farms under conditions of the usage of traditional power flow calculation method.
详细分析了传统潮流算法下输电线路故障对线路传输容量越限以及风电场容量可信度的影响。
应用推荐