The stripe coat must be applied prior to full coat on the erection joints, marker of tanks, water line, draft mark, ship name and port register etc of shell plate.
外壳上的焊缝、舱室标记、水线标记、水尺、船名、港籍名等每一度涂层施工前均要做预涂;
To eliminate the frequent failures of induced draft fans installed at Shimen Power Plant due to serious vibrations an on line vibration monitoring system has been developed for the above fans.
针对石门电厂引风机振动大的频发故障,研制出引风机振动在线监测系统。
应用推荐