The basic problem is that many transmission lines, and the connections between them, are simply too small for the amount of power companies would like to squeeze through them.
根本的问题是,与电力公司希望输送的电量相比,许多输电线路和它们之间的连接线路的额定负荷能力太小了。
A handful of states like California that have set aggressive goals for renewable energy are being forced to deal with the issue, since the goals cannot be met without additional power lines.
许多像加利福尼亚这样设定了雄心勃勃的再生能源目标的州都被迫正在解决这一问题,因为不建新的输电线路就不可能实现这些目标。
Think in terms of a subway map, but add in layers of data like water and sewer lines, power grids, and real time traffic information.
例如,在地铁地图上增加其他一些数据,如供水和排水管道、电网和实时交通信息等。
应用推荐