Monitoring data and calculation results show that, on large embedded depth condition, steel arch and shotcrete are the main force structure, especially steel arch , significant role. Second lining of the security, good working conditions, there were enough safety reserves.
监测及计算结果表明,大埋深条件下,型钢钢架和喷射混凝土为主要受力结构,尤其是型钢钢架受力较大,作用显著;二次衬砌受力安全,工作状态良好,有足够的安全储备。
参考来源 - 秦岭终南山公路隧道大埋深段施工监控量测与数值分析·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐