A business process re-engineering effort at a large enterprise is a complex undertaking that may take several years and involve many people and many IT systems.
在大型企业中,业务流程重构工作是一项非常复杂的项目,可能要花费数年,并涉及到众多的人力和信息技术系统。
"Drawing Standard HVAC" (GB/T50114-2001) The air conditioning water systems engineering large, complex and prone to water imbalance, so use a good hydraulic balance system with the program.
《暖通空调制图标准》 (GB/T50114-2001) 本工程空调水系统庞大而复杂,且容易产生水力失调,所以选用了水力平衡性较好 的同程式系统。
In engineering design optimization (DO) of large-scale and complex systems, it is important to handle epistemic uncertainty which exists in design parameters and stages of DO.
在对大规模复杂系统进行设计优化的过程中,处理好各环节和各设计参数中存在的认知不确定性是十分重要的。
应用推荐