In the foundation treatment for the converter of main plant building of large scale steel mill, it is the first time to replace conventional pile foundation design by grouting technique.
在大型炼钢厂转炉主厂房的地基处理上,首次引进注浆技术取代常规桩基设计。
By applying cooling down method of adding factory air into the HP system, shortens urea converter cooling down time to a large scale and decreases shutdown losses for enterprise.
通过采用向尿素合成塔加入工厂空气的降温方法,与传统方法相比大幅度缩短降温时间,为企业减少停工损失。
应用推荐