To fill the research gaps in this field, laboratory model tests were carried out.
为填补这方面研究的空白,开展了实验室模型试验研究。
Laboratory model tests are carried out to investigate the effect of inclined Angle of the anchor on the uplift capacity and the mechanism of uplift failure.
笔者通过室内模型试验对螺旋锚的倾斜角度对其上拔承载力的影响及其上拔破坏机理进行了探讨。
The settlement at Yishanlu Metro Station of Line 9 in Shanghai caused by dewatering is studied, based on the laboratory model tests, field monitoring and numerical simulation.
通过对上海地铁九号线宜山路站的室内模型试验、现场监测数据的分析以及数值模拟方法对宜山路站降水引起的沉降问题作了研究。
应用推荐