In this paper authors introduced a series of measures adopted to settle problems of grouted stake in karst areas and experience of learning from construction of driving grouting piles.
本文介绍了变电站冲孔灌注桩在石灰岩溶洞地区的施工过程中出现的主要问题和所采取的措施以及作者在施工中获得的一些体会。
In this paper, a series of grouting simulating tests show that it is feasible to reinforce roadbed horizontally in karst areas. The corresponding formula for making this grouts is obtained.
通过室内试验研究了采用该浆液进行岩溶洞穴路基水平注浆加固的可行性及相应的注浆材料配方。
应用推荐