The construction plan, process flow, construction method, pre control of jacking quality and matters need attention are elaborated in detail.
并对其施工方案、工艺流程、施工方法、顶进质量的预控和安全注意事项作了详细的阐述。
Abstract: the framework of existing in jacking bridge before construction, according to the actual situation of construction site make feasible construction method.
摘要:既有线框架桥顶进施工前,要根据施工现场实际情况制定切实可行的施工方法。
This paper introduces the construction program and practicing method of the foundation underpinning and column foundation jacking restoration.
本文介绍了采用基础托换与柱基顶升复位施工的程序和做法。
应用推荐