Abstract: the framework of existing in jacking bridge before construction, according to the actual situation of construction site make feasible construction method.
摘要:既有线框架桥顶进施工前,要根据施工现场实际情况制定切实可行的施工方法。
The construction plan, process flow, construction method, pre control of jacking quality and matters need attention are elaborated in detail.
并对其施工方案、工艺流程、施工方法、顶进质量的预控和安全注意事项作了详细的阐述。
With a practical project, authors state application status of the pipe jacking method in construction of contact tunnels of a subway shield zone tunnel.
从工程实例出发介绍顶管法在地铁盾构区间隧道联络通道施工中的应用情况。
应用推荐