The results show that earned value project management method can make integrated management of logistics cost, and provide a basis for better grasping and controlling the project operating conditions.
研究表明,挣值管理方法能够对项目物流成本进行集成管理,它为管理者更好地掌握和控制项目运行状况提供了决策依据。
This paper puts forward that integrated evaluation method of fuzzy set and coercive 04 scoring method in value analysis theory can be used to evaluate college libraries.
提出了运用模糊集合法与价值分析理论中的强制打分法———“04打分法”相结合的综合评估方法对高校图书馆进行评估。
This method arranges an integrated prior order of the factors influencing the post value at first, and then carries on a fuzzy comprehensive evaluation to each post.
这个方法首先对影响岗位价值的因素进行排序,然后对每个岗位进行模糊综合评价。
应用推荐