This paper studies an integral programming model of production schedule in rayon factory, presents the method of solution and application example.
本文给出了人造丝厂生产作业计划整数规划模型、求解方法和应用实例。
Based on the quadratic integral programming model of the multiuser detection problem, a detection strategy by the semidefinite programming method with pretreatment is presented.
基于多用户检测问题的二次整数规划模型,提出了一种带预处理的半定规划多用户检测方法。
A model of double objective mixed integral programming for settling production planning problems without the cost of adjustment was established.
为解决实际生产中一种无调整费用的生产计划问题,给出了一个双目标混合整数规划模型。
应用推荐