Total time for Installation, training and commissioning is not more than three days.
安装调试,培训和验收时间总计不超过三天。
Main areas for the company: food, dairy production equipment manufacture, installation, commissioning, engineering, technical advice and training, development of new products.
公司的主营范围为:食品、乳制品生产设备的制造、安装、调试、工程设计、技术咨询与培训,新产品开发研制等。
We are responsible for the equipment installation, commissioning and user side during the work of technicians and operators to provide free technical training.
我方负责在设备安装,调试期间对用户方技术人员和操作工作免费提供技术培训。
应用推荐